Woodside housing: estimates with margins
The American Community Survey estimates about 2,062 housing units in Woodside, give or take 176 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 (Year Structure Built), Woodside town, California, checked 21 November 2026). Because the town is small, every percentage below has a wide margin.
Roughly 68% of units were built before 1980, within about 8 percentage points, and roughly 43% before 1960, within about 7 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 (Year Structure Built), Woodside town, California, checked 21 November 2026). The estimated median year built is 1965, plus or minus 6 years (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25035 (Median Year Structure Built), Woodside town, California, checked 21 November 2026).
About 98% of units are single-family houses (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25024 (Units in Structure), Woodside town, California, checked 21 November 2026), and about 13% of occupied homes are rented, within 5 points (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25003 (Tenure), Woodside town, California, checked 21 November 2026).
These are estimates about a town. They are no guide to the framing, roof or crawlspace of any single house.
The demolition checklist, item by item
Woodside’s Permits page groups building work into three permit types: building, demolition and re-roof (Town of Woodside, Permits, checked 21 November 2026). For demolition it warns applicants not to read its handout as complete. The demolition handout is designed for the average submittal.
(Town of Woodside, Permits, checked 21 November 2026)
The checklist itself starts with how to apply: by e-mail, with the application and documents as PDF files (Town of Woodside, Demolition Permit Submittal Checklist, checked 21 November 2026). The Town of Woodside is now accepting digital (electronic) plans and documents for the building permit submittal.
(Town of Woodside, Demolition Permit Submittal Checklist, checked 21 November 2026)
The site plan has to show the existing utilities in the area of work and the trees there, with a tree protection plan (Town of Woodside, Demolition Permit Submittal Checklist, checked 21 November 2026).
Storage in the road is restricted: no materials or containers, debris boxes included, in the public right-of-way without a permit from the Engineering Division (Town of Woodside, Demolition Permit Submittal Checklist, checked 21 November 2026).
And if nothing is going up in place of what comes down: If the area of demolition is not being re-built, please submit a site restoration plan.
(Town of Woodside, Demolition Permit Submittal Checklist, checked 21 November 2026)
PCBs get their own paragraph on the Permits page. Below is a flow chart and form to manage PCBs in building materials during demolition, per Provision C12.f of the Regional Municipal Stormwater Permit.
(Town of Woodside, Permits, checked 21 November 2026) The Town expects little of it to apply: Since most of the structures in Town are wood framed and/or single-family residential, these requirements won’t apply
(Town of Woodside, Permits, checked 21 November 2026). All the same, the forms will still need to be completed and submitted along with the Building Permit application
(Town of Woodside, Permits, checked 21 November 2026). The checklist repeats the point, saying the screening form is required to accompany all building permit demo applications
(Town of Woodside, Demolition Permit Submittal Checklist, checked 21 November 2026).
The Demolition Permit section links the submittal requirements, a PCBs application form, a screening assessment package and a screening flow chart (Town of Woodside, Permits, checked 21 November 2026). What a screening involves, when one is needed, is on the PCB screening page.
Housing complaints in a town of houses
Woodside has few rentals and no apartment buildings in the census sense: the survey finds no housing in buildings of five or more units (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25024 (Units in Structure), Woodside town, California, checked 21 November 2026).
That puts nearly every home outside the county’s housing program. County Environmental Health takes complaints for Rental properties (apartment buildings with four units or more)
(San Mateo County Health, Renters Resources, checked 22 November 2026). For the rest its page says: Single-family homes, duplexes, and triplexes: Contact your local Code Enforcement Department.
(San Mateo County Health, Renters Resources, checked 22 November 2026)
We did not find a Woodside page that describes a housing complaint process of its own. The Town’s site carries a general Submit a Request link (Town of Woodside, Permits, checked 21 November 2026), and the county’s page is the clearest public statement of who handles what.
More for the few tenants and the many owners is on the page about mold testing in Woodside.
Taking down an outbuilding or opening up the main house? If moisture or mold in what stays is a question, call.
Call 510-288-9993Asbestos and lead paint rules in Woodside
FoxMeter does not offer asbestos surveys or lead paint inspections at this time. This section explains what local agencies ask for and who is allowed to do the work.
Woodside’s demolition checklist asks for one document that concerns asbestos: the Bay Area Air Quality Management District "J Number" (Town of Woodside, Demolition Permit Submittal Checklist, checked 21 November 2026).
That number comes out of the district’s notification process, which applies to Every demolition regardless of asbestos content.
(Bay Area Air District, Asbestos, checked 22 November 2026) For a house the notice can be shorter: for buildings of four or fewer dwelling units, you may notify the Air District 72 hours in advance with the payment of an additional fee.
(Bay Area Air District, Asbestos, checked 22 November 2026)
County programs on lead are described on the San Mateo County page.
Who may do the survey work is fixed by state law, whatever the size of the town. No one may practice as an asbestos consultant unless he or she is certified by the Division of Occupational Safety and Health
(California Legislative Information, Business and Professions Code section 7180, checked 22 November 2026), and the Health and Safety Code requires a state certificate of Persons who receive pay for doing lead hazard evaluations, including, but not limited to, lead inspections, lead risk assessments, or lead clearance inspections
(California Legislative Information, Health and Safety Code section 105254, checked 22 November 2026).
What can be tested at a Woodside property
The Woodside mold page speaks to owners first, since most homes here are owner-occupied.
The test for lead in drinking water is described on a page of its own.
PCB screening is seldom needed here, by the Town’s own account, but the form still has to be filed.
FoxMeter does the testing only.
Nearby towns and the county
County rules are on the San Mateo County page.
Nearby on our list: Redwood City, Atherton, Menlo Park and Portola Valley.