foxmeter.
510-288-9993info@foxmeter.com

ALAMEDA COUNTY / SAN LEANDRO

Environmental Testing in San Leandro, CA

San Leandro keeps a Substandard Housing Checklist among its building forms, and two of its lines concern damp rooms and visible mold. FoxMeter inspects San Leandro homes for mold, takes air or surface samples when a question calls for them, and explains what the laboratory found; below is what the City asks before a remodel or demolition and where a renter turns. Chapter 3-23 of the Municipal Code sets a PCB screening step for some demolition permits, and FoxMeter offers PCB screening. Testing for lead in drinking water at your own tap is a separate service.

01

A median house from 1959

The American Community Survey counts 31,954 housing units in San Leandro, give or take 701. About 77% of them went up before 1980 and 53% before 1960 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 (Year Structure Built), San Leandro city, California, checked 22 November 2026), so the median year built lands at 1959 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25035 (Median Year Structure Built), San Leandro city, California, checked 22 November 2026).

Single-family structures account for 67% of the stock, and 24% of units are in buildings of five or more (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25024 (Units in Structure), San Leandro city, California, checked 22 November 2026).

A citywide year tells you how many homes are old, not what one wall cavity or crawlspace holds; that is a question for a visit.

02

San Leandro’s 2025 demolition submittal and Chapter 3-23

Any owner who means to alter, repair or demolish a building first needs a permit from the Building Official under Section 105 of Title VII, Chapter 5 (City of San Leandro, Unpermitted Work, checked 22 November 2026), and earlier permits for an address can be looked up on the Accela Citizen Portal (City of San Leandro, Unpermitted Work, checked 22 November 2026). The Building & Safety forms page carries the PCBs Assessment Packet, the waste diversion form and the 2025 demolition guidelines in one list (City of San Leandro, Building Fees / Forms / Submittal Facts, checked 22 November 2026).

Those guidelines open with a plain instruction: Prepare the submittal documents listed below as PDF files. (City of San Leandro, Demolition Permit Submittal Guidelines, checked 22 November 2026) A residential demolition gets its first plan review in roughly 3 to 7 business days, with the same again for a resubmittal (City of San Leandro, Demolition Permit Submittal Guidelines, checked 22 November 2026). The submittal also needs PG&E clearance, a capped water meter and sewer lines capped five feet behind the property line (City of San Leandro, Demolition Permit Submittal Guidelines, checked 22 November 2026), and grading of 50 cubic yards or more takes its own permit (City of San Leandro, Demolition Permit Submittal Guidelines, checked 22 November 2026).

PCBs have a chapter of their own in the Municipal Code. It covers This Chapter applies to Applicants for buildings constructed or remodeled from January 1, 1950 to December 31, 1980. (City of San Leandro, Chapter 3-23: Management of PCBs During Building Demolition Projects, checked 22 November 2026) The code then states that Every Applicant for a building demolition permit shall conduct a PCBs in Priority Building Materials Screening Assessment (City of San Leandro, Chapter 3-23: Management of PCBs During Building Demolition Projects, checked 22 November 2026), yet remodels and wood-framed or single-family demolitions fall outside it (City of San Leandro, Chapter 3-23: Management of PCBs During Building Demolition Projects, checked 22 November 2026). The screening sorts the building by age, use and construction and, where needed, checks materials by records or sampling (City of San Leandro, Chapter 3-23: Management of PCBs During Building Demolition Projects, checked 22 November 2026); results are kept five years (City of San Leandro, Chapter 3-23: Management of PCBs During Building Demolition Projects, checked 22 November 2026). The guidelines ask for the PCB report pages of the packet when an entire commercial structure comes down (City of San Leandro, Demolition Permit Submittal Guidelines, checked 22 November 2026), and the packet itself is the regional model written for the stormwater permit (City of San Leandro, PCBs in Priority Building Materials: Model Screening Assessment Applicant Package, checked 22 November 2026), which is covering municipal stormwater discharges from entities in Alameda, Contra Costa, San Mateo, Santa Clara, and Solano counties listed in the Order (San Francisco Bay Regional Water Quality Control Board, Stormwater, checked 22 November 2026).

Debris has been regulated here since 2003 (City of San Leandro, Construction Site Recycling, checked 22 November 2026). On jobs valued at $100,000 or more at permit issuance (City of San Leandro, Construction Site Recycling, checked 22 November 2026), The City’s Ordinance requires contractors to recycle 100% of all asphalt/concrete and 50% of all other Construction and Demolition (C&D) debris (City of San Leandro, Construction Site Recycling, checked 22 November 2026). The plan is filed with Green Halo under the permit number (City of San Leandro, Construction Site Recycling, checked 22 November 2026), and applicants upload recycling and disposal receipts minimum every 30-days and submit the Waste Diversion Report before scheduling the final inspection. (City of San Leandro, Construction Site Recycling, checked 22 November 2026)

03

MySL, door hangers and the Rent Program

Building Code Enforcement in San Leandro works under several codes, among them the International Property Maintenance Code, and the California Health and Safety Code (Section 17920) (City of San Leandro, Building Code Enforcement, checked 22 November 2026). The enforcement process begins when a concern is reported to us. (City of San Leandro, Building Code Enforcement, checked 22 November 2026) The preferred method to report concerns is by using MySL. (City of San Leandro, Building Code Enforcement, checked 22 November 2026)

The first step is a courtesy door hanger; a Notice of Violation follows, posted and mailed with 1 to 30 days to fix the problem (City of San Leandro, Building Code Enforcement Process, checked 22 November 2026). Unresolved cases move to citations of $130, $700 and then $1,300 (City of San Leandro, Building Code Enforcement Process, checked 22 November 2026).

The Rent Program combines a yearly rental registry with rent stabilization starting January 1, 2027 (City of San Leandro, Rent Program, checked 22 November 2026). Under it, Tenants may file a rent decrease petition when housing services are reduced without a corresponding reduction in rent. (City of San Leandro, Tenants, checked 22 November 2026) For habitability questions the City points tenants and landlords to ECHO Housing, which also mediates disputes (City of San Leandro, Tenants, checked 22 November 2026).

The page on mold testing in San Leandro covers how mold fits into these steps.

Preparing a San Leandro demolition or answering a code notice? Phone us first and describe the building.

Call 510-288-9993
04

Asbestos and lead paint rules in San Leandro

FoxMeter does not offer asbestos surveys or lead paint inspections at this time. This section explains what local agencies ask for and who is allowed to do the work.

San Leandro’s demolition guidelines list an Asbestos Report / Lead Report (City of San Leandro, Demolition Permit Submittal Guidelines, checked 22 November 2026) among the submittal items, and a J-Number Letter from BAAQMD (City of San Leandro, Demolition Permit Submittal Guidelines, checked 22 November 2026) for full demolitions and for removal of at least 100 square feet of friable material containing 1% or more asbestos (City of San Leandro, Demolition Permit Submittal Guidelines, checked 22 November 2026).

The air district’s notice rule reaches Every demolition regardless of asbestos content. (Bay Area Air District, Asbestos, checked 22 November 2026), and the district says that The Air District must be notified at least 10 business days before (Bay Area Air District, Asbestos, checked 22 November 2026) the work starts.

County grants for lead paint hazard repairs in pre-1960 homes are described on the Alameda County page (Alameda County Healthy Homes Department, Lead Paint Hazard Repair Funding, checked 22 November 2026).

State law decides who is paid for this survey work: an asbestos consultant may not practice unless he or she is certified by the Division of Occupational Safety and Health (California Legislative Information, Business and Professions Code section 7180, checked 22 November 2026), and in California Only those who are paid to do lead inspections are required to be CDPH LRC-certified Inspector/Assessors. (CDPH, Is Certification Required?, checked 22 November 2026)

05

Ordering tests for a San Leandro building

Most San Leandro requests are mold inspections, with air or surface samples taken when they help settle a question about a stain, a smell or a wet crawlspace.

PCB screening fits the assessment that Chapter 3-23 asks of covered demolition applicants.

Testing for lead in tap water is done at your own faucet and is ordered on its own.

The work stops at the laboratory result and its explanation; FoxMeter does not remove mold or make repairs.

06

Alameda County pages and two neighbours on our list

San Leandro is part of Alameda County, and countywide programs are on the Alameda County page.

Other cities on our list close by are Oakland and Hayward.

YOUR NEXT STEP

Tell us about the San Leandro building.

Give us the address and say whether it is a remodel, a demolition, a sale or a rental question.