Morgan Hill homes by the numbers
The American Community Survey puts the number of housing units in Morgan Hill at 15,543. Roughly 34% of them date from before 1980 and 6% from before 1960 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 (Year Structure Built), Morgan Hill city, California, checked 22 November 2026). Half of the stock was built in 1990 or later (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25035 (Median Year Structure Built), Morgan Hill city, California, checked 22 November 2026).
Single-family houses make up 77% of the units (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25024 (Units in Structure), Morgan Hill city, California, checked 22 November 2026), which is why most projects that reach the Building Division here are houses rather than apartment blocks.
None of these figures says anything about a particular house. Whether a wall cavity or a crawlspace has stayed dry is something only a look at that house can tell.
Before a remodel or a demolition in Morgan Hill
The Building Division takes building permit applications, fire permit applications and plans by email (City of Morgan Hill, Building & Fire Prevention, checked 22 November 2026), and it is strict about the format: Only PDF submittals will be accepted.
(City of Morgan Hill, Building & Fire Prevention, checked 22 November 2026) Since January 2026 all permit applications must comply with the 2025 California Building Standards Codes as adopted and amended by the Morgan Hill Municipal Code
(City of Morgan Hill, Building & Fire Prevention, checked 22 November 2026). Only a few residential jobs, such as reroofs, repipes and solar, can be applied for online, and only by a contractor (City of Morgan Hill, Building & Fire Prevention, checked 22 November 2026).
Starting work first is costly. On the City’s complaints page: Penalty fees are assessed for work started without first obtaining a permit.
(City of Morgan Hill, Common Code Complaints, checked 22 November 2026)
A demolition has its own package. It begins with a check by the Planning Division that the building is not historical, then asks for a building permit application, a demolition affidavit, a demolition notice, a site or demolition plan with erosion control, and a posted sign (City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026). The utilities come next: Submit a disconnect letter from PG&E.
(City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026)
Debris is planned before the permit, not after. The package says Submit a Construction Waste Management Plan form.
(City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026) That plan reaches the Building Division before the permit is issued, and demolitions, new buildings and residential additions and alterations must divert at least 65% of their construction and demolition materials from landfills (City of Morgan Hill, Construction Waste Management (CWM) Plan, checked 22 November 2026).
The paper trail matters at the end. Weight receipts for every load hauled away go into the final report (City of Morgan Hill, Construction Waste Management (CWM) Plan, checked 22 November 2026), and Final Report must be submitted to the Building Division prior to Final Inspection.
(City of Morgan Hill, Construction Waste Management (CWM) Plan, checked 22 November 2026) The demolition package adds that All rubble, including footings, slab on grade and all debris must be removed and the site graded.
(City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026)
Old septic tanks and wells are a separate matter: Abandonment of septic tanks and wells require a separate clearance from the Santa Clara County Department of Environmental Health.
(City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026) The final inspection also looks for capped and inspected water lines and sewer laterals (City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026).
On PCBs, the City’s forms page has no screening form of its own (City of Morgan Hill, Forms in PDF Format, checked 22 November 2026). Santa Clara County describes the step: Starting July 1, 2019, all applicants proposing to demolish a building must complete a PCBs Screening Assessment Form.
(County of Santa Clara, Prevent PCB release during building demolitions, checked 22 November 2026) Its stormwater program narrows who is affected: Single-family homes and wood-frame structures are exempt.
(SCVURPPP, Managing PCBs during Demolition, checked 22 November 2026) The PCB screening page explains what the form asks about.
Housing complaints in Morgan Hill
Morgan Hill has no separate rental inspection office. The Building Division is responsible for code compliance and enforcement of the Morgan Hill Municipal Code.
(City of Morgan Hill, Code Compliance, checked 22 November 2026) A complaint goes in through the online form or a PDF version (City of Morgan Hill, Code Compliance, checked 22 November 2026), and the forms page carries a Code Violation Complaint Form as well (City of Morgan Hill, Forms in PDF Format, checked 22 November 2026).
The Building Division describes its approach plainly: The majority of code complaints are resolved through letters and personal contact with the property owner.
(City of Morgan Hill, Common Code Complaints, checked 22 November 2026) Its list of common complaints is about permits, junk, weeds and structures and has no heading for the condition of a rental (City of Morgan Hill, Common Code Complaints, checked 22 November 2026).
The county points tenants back to the city: Need to submit a substandard housing complaint? Contact your local city code enforcement!
(County of Santa Clara, City code enforcement contacts, checked 22 November 2026) For tenants, the City’s housing pages post know-your-rights handouts on habitability, deposits and evictions in English and Spanish (City of Morgan Hill, Tenant & Landlord Resources, checked 22 November 2026), and name Project Sentinel for counseling and referral (City of Morgan Hill, Tenant & Landlord Resources, checked 22 November 2026).
How a mold complaint plays out, step by step, is on the page about mold testing in Morgan Hill.
Planning a remodel or answering a complaint about a rental? Call and ask what an inspection would look at.
Call 510-288-9993Asbestos and lead paint rules in Morgan Hill
FoxMeter does not offer asbestos surveys or lead paint inspections at this time. This section explains what local agencies ask for and who is allowed to do the work.
Morgan Hill’s demolition package ties the permit to the Bay Area Air Quality Management District. Applicants must Submit copy of BAAQMD permit (J#) to the City of Morgan Hill.
(City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026) Where no notification is needed, the applicant signs a declaration: I hereby declare that the written asbestos notification to BAAQMD is not required for the demolition described in this application.
(City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026)
The City may hold the demolition permit until exemption from or compliance with the district’s asbestos rules is shown (City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026), and the package points to the state list of Certified Asbestos Consultants (City of Morgan Hill, Demolition Permit Application Package, checked 22 November 2026). The district’s own rule covers Every demolition regardless of asbestos content.
(Bay Area Air District, Asbestos, checked 22 November 2026)
For lead paint, Santa Clara County runs a Lead Safe Homes Program for homes built before 1978 (County of Santa Clara, Learn about the Lead Safe Homes Program, checked 22 November 2026); more is on the Santa Clara County page.
State law decides who may be paid for the surveys. The Department of Public Health says: Only those who are paid to do lead inspections are required to be CDPH LRC-certified Inspector/Assessors.
(CDPH, Is Certification Required?, checked 22 November 2026) For asbestos, nobody may practice as a consultant unless he or she is certified by the Division of Occupational Safety and Health
(California Legislative Information, Business and Professions Code section 7180, checked 22 November 2026).
Testing that can be booked for a Morgan Hill address
A mold inspection with air or surface samples where they help, and a written explanation of what the laboratory found.
PCB screening for a building that falls under the county’s demolition screening step.
A tap sample for lead in drinking water, separate from the City’s own well monitoring.
FoxMeter tests only. It does not remove mold or carry out repairs.
Santa Clara County and nearby cities
Morgan Hill is in Santa Clara County; the countywide programs are on the Santa Clara County page.
Nearby on our list: San Jose to the north and Gilroy to the south.