Monte Sereno’s homes by the numbers
Monte Sereno is small enough that the American Community Survey gives wide margins, so treat these as estimates. The survey counts about 1,427 housing units, plus or minus 148. Roughly 70% date from before 1980, with a margin of 14 points, and roughly 42% from before 1960, with a margin of 13 points (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 (Year Structure Built), Monte Sereno city, California, checked 22 November 2026).
The estimated median year built is 1965, give or take 6 years (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25035 (Median Year Structure Built), Monte Sereno city, California, checked 22 November 2026).
A construction year describes the town, not a particular house. Whether a given wall or crawlspace has stayed dry is something only a look at that house can answer.
Remodels and teardowns at the Monte Sereno counter
The City describes its Building Department this way: The Building Department is responsible for administering the California Building Code requirements through plan checking, building permits, and on-site inspections.
(City of Monte Sereno, Building and Planning Departments, checked 22 November 2026) Since 2024 the paper route has closed for new work: Effective January 3, 2024, all new applications for building permits that require a plan check shall be submitted online.
(City of Monte Sereno, Building and Planning Departments, checked 22 November 2026) Small jobs such as a water heater, water pipes or a reroof can be permitted online without plans (City of Monte Sereno, Building and Planning Departments, checked 22 November 2026).
Bathrooms are a common place to find hidden water damage, and the City’s bathroom handout sets the line for a permit: A permit is required for bathroom remodels that include the replacement of the tub/shower enclosure.
(City of Monte Sereno, Residential Bathroom Remodel: Building Division Requirements, checked 22 November 2026) Swapping a sink or toilet in place does not need one (City of Monte Sereno, Residential Bathroom Remodel: Building Division Requirements, checked 22 November 2026). The same handout calls for ventilation: Exhaust fans with a minimum ventilation rate of 50 CFM are required in all bathrooms, even if an operable window is installed.
(City of Monte Sereno, Residential Bathroom Remodel: Building Division Requirements, checked 22 November 2026) It also asks for a shower pan or a watertight lining under shower floors (City of Monte Sereno, Residential Bathroom Remodel: Building Division Requirements, checked 22 November 2026).
Kitchens follow a similar rule. A permit is required for kitchen remodels that include the replacement of kitchen cabinets.
(City of Monte Sereno, Residential Kitchen Remodel: Building Division Requirements, checked 22 November 2026) A new countertop alone does not (City of Monte Sereno, Residential Kitchen Remodel: Building Division Requirements, checked 22 November 2026).
For a full demolition, the City’s submittal list asks for a site plan, a sewer capping permit from the West Valley Sanitation District, a PG&E release letter and a tree protection plan (City of Monte Sereno, Demolition Permit Submittal Requirements, checked 22 November 2026). A septic tank being abandoned needs the county’s approval as well (City of Monte Sereno, Demolition Permit Submittal Requirements, checked 22 November 2026). The application goes in online with a deposit, and the first plan check is described as taking about three weeks (City of Monte Sereno, Demolition Permit Submittal Requirements, checked 22 November 2026).
On site, Dust control measures shall be implemented on site at all times.
(City of Monte Sereno, Demolition Permit Submittal Requirements, checked 22 November 2026) When the structure and the debris are gone, the Building Department does a final inspection (City of Monte Sereno, Demolition Permit Submittal Requirements, checked 22 November 2026).
The PCBs step comes from the stormwater permit shared by the West Valley towns: All applicants for demolition permits must conduct an assessment to screen for PCBs in priority building materials beginning July 1, 2019.
(West Valley Stormwater Authority, Polychlorinated Biphenyls (PCBs), checked 22 November 2026) The City’s handout marks Part 1 as Required for ALL Demolition Permit Applicants PCBs Screening Assessment Form – Part 1
(City of Monte Sereno, Demolition Permit Submittal Requirements, checked 22 November 2026). Single-family and wood-frame buildings are screened out by the form’s first question (City of Monte Sereno, Demolition Permit Submittal Requirements, checked 22 November 2026), and the county’s program page describes the same form (County of Santa Clara, Prevent PCB release during building demolitions, checked 22 November 2026). More on this is on the PCB screening page.
Work hours are fixed too: weekdays 8 am to 8 pm, Saturdays 9 am to 5 pm, and nothing on Sundays or holidays (City of Monte Sereno, Building and Planning Departments, checked 22 November 2026).
Rented homes and housing complaints
Rentals are rare in Monte Sereno, and the City has no separate rent or tenant office. Its Housing Element records that No such housing conditions have been identified by staff or received as a code enforcement complaint.
(City of Monte Sereno, Monte Sereno 6th Cycle Housing Element (2023-2031), checked 22 November 2026) It also commits the City to keep enforcing its codes on homes that are not kept up (City of Monte Sereno, Monte Sereno 6th Cycle Housing Element (2023-2031), checked 22 November 2026).
A tenant with a problem the owner will not fix can also go to Santa Clara County. The county’s Department of Environmental Health says you can file a complaint to your local code enforcement or file a complaint with us
(County of Santa Clara, City code enforcement contacts, checked 22 November 2026), and it accepts reports by mail, in person or online (County of Santa Clara, City code enforcement contacts, checked 22 November 2026).
How that process works for mold, and what a private report can and cannot do in it, is on the page about mold testing in Monte Sereno.
Planning a remodel or answering a tenant’s complaint in Monte Sereno? Call and ask what an inspection would cover.
Call 510-288-9993Asbestos and lead paint rules in Monte Sereno
FoxMeter does not offer asbestos surveys or lead paint inspections at this time. This section explains what local agencies ask for and who is allowed to do the work.
Monte Sereno’s demolition plans must show the "J" Number from the Bay Area Air Quality Management District
(City of Monte Sereno, Demolition Permit Submittal Requirements, checked 22 November 2026), the job number issued when the Air District is notified.
The district’s notification covers Every demolition regardless of asbestos content.
(Bay Area Air District, Asbestos, checked 22 November 2026) It extends to renovation as well: Any renovation involving the removal of 100 sq. ft. or more, 100 linear ft. or more, or 35 cubic feet or more of asbestos.
(Bay Area Air District, Asbestos, checked 22 November 2026)
On lead paint, Santa Clara County runs a program described as follows: The Lead Safe Homes Program is a NEW county program administered by Habitat for Humanity
(County of Santa Clara, Learn about the Lead Safe Homes Program, checked 22 November 2026). Countywide details are on the Santa Clara County page.
Who may be paid for these surveys is set by state law. The Department of Public Health states: Only those who are paid to do lead inspections are required to be CDPH LRC-certified Inspector/Assessors.
(CDPH, Is Certification Required?, checked 22 November 2026) And no one may act as an asbestos consultant unless he or she is certified by the Division of Occupational Safety and Health
(California Legislative Information, Business and Professions Code section 7180, checked 22 November 2026).
Services for a Monte Sereno address
A mold inspection looks for moisture and growth, and samples are taken when they would answer a question the eye cannot.
PCB screening matches the Part 2 step of the City’s demolition form, for the buildings that reach it.
A test for lead in drinking water is ordered on its own page.
FoxMeter does testing only. It does not remove mold or rebuild walls.
Santa Clara County and nearby
Monte Sereno belongs to Santa Clara County; the county’s programs are on the Santa Clara County page.
Nearby on our list: Los Gatos, Saratoga, Campbell and San Jose. Los Gatos, Saratoga and Campbell share the same West Valley stormwater program (West Valley Stormwater Authority, Polychlorinated Biphenyls (PCBs), checked 22 November 2026).