How old Half Moon Bay’s homes are
The American Community Survey puts Half Moon Bay at 4,473 housing units, with a margin of about 386. Roughly 52% of them were built before 1980 and 17% before 1960 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 (Year Structure Built), Half Moon Bay city, California, checked 22 November 2026). The median year built is 1979 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25035 (Median Year Structure Built), Half Moon Bay city, California, checked 22 November 2026).
Detached and attached single-family houses account for 80% of the units, while buildings with five or more units hold only 9% (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25024 (Units in Structure), Half Moon Bay city, California, checked 22 November 2026). Most remodel questions in town are therefore questions about one house and its own crawlspace, attic and walls.
A construction year is a date on a record. Whether a given wall has stayed dry is a separate question, and only looking and measuring answers it.
Permits, inspections and debris paperwork
A Half Moon Bay building permit can be filed online through Cloudpermit or in person at City Hall. At the counter, the applicant fills out the City’s application and shows an active Half Moon Bay business license (City of Half Moon Bay, Applying for a Building Permit, checked 22 November 2026). Anything submitted from January 2026 on is held to the newest edition: your submittals need to conform with the current versions of the 2025 California Building Code
(City of Half Moon Bay, Applying for a Building Permit, checked 22 November 2026).
The online account also shows permit and inspection status, lets you schedule or cancel inspections and keeps a time-stamped message thread with the building department (City of Half Moon Bay, Applying for a Building Permit, checked 22 November 2026). Contractors register in the system first and only then open an application (City of Half Moon Bay, Applying for a Building Permit, checked 22 November 2026).
The City’s submittal checklist names kitchen and bathroom remodels, additions and ADUs among the projects it covers (City of Half Moon Bay, Residential / Commercial Submittal Checklist, checked 22 November 2026). It is relaxed about who draws the plans and firm about what they show: Plans can be prepared by anyone; however, they must be drawn to scale and clearly show the scope of work being proposed.
(City of Half Moon Bay, Residential / Commercial Submittal Checklist, checked 22 November 2026) Demolition of structures on site is one of the examples of extra documents a project may need (City of Half Moon Bay, Residential / Commercial Submittal Checklist, checked 22 November 2026).
Debris gets its own form. Projects under Municipal Code chapter 14.50 or the CALGreen debris rules file a Construction and Demolition Debris Waste Management Plan for approval before the permit is issued (City of Half Moon Bay, Construction and Demolition Debris Waste Management Plan, checked 22 November 2026). The WMP describes how the applicant will reuse and/or recycle materials generated during demolition and/or construction of the project
(City of Half Moon Bay, Construction and Demolition Debris Waste Management Plan, checked 22 November 2026) The target is spelled out on the form: Applicants subject to CALGreen must meet a minimum 50% recycling rate for their projects.
(City of Half Moon Bay, Construction and Demolition Debris Waste Management Plan, checked 22 November 2026)
When the work ends, the applicant turns in original weight tickets for every load hauled away (City of Half Moon Bay, Construction and Demolition Debris Waste Management Plan, checked 22 November 2026). Those tickets are part of the close-out. Review and approval of all documentation including receipts is required before scheduling a final inspection.
(City of Half Moon Bay, Construction and Demolition Debris Waste Management Plan, checked 22 November 2026)
Inspections are booked the same way the permit was filed: All inspections are scheduled online through Cloudpermit.
(City of Half Moon Bay, Building, Planning and Public Works Inspections, checked 22 November 2026) They run Monday through Thursday and on Friday mornings (City of Half Moon Bay, Building, Planning and Public Works Inspections, checked 22 November 2026). Before the final, the Building Department wants the business license, the recycling form and sign-off from every other department involved (City of Half Moon Bay, Building, Planning and Public Works Inspections, checked 22 November 2026), and on homes a smoke and carbon monoxide handout (City of Half Moon Bay, Building, Planning and Public Works Inspections, checked 22 November 2026).
Work hours are fixed too, with weekday work allowed from 7 am to 6 pm and later starts on weekends and holidays (City of Half Moon Bay, Building, Planning and Public Works Inspections, checked 22 November 2026).
Anyone planning gas work should read the City’s electrification page. The 2022 ordinance keeps existing all-electric homes from adding gas or propane (City of Half Moon Bay, Building Electrification, checked 22 November 2026), although the City has paused enforcement of the portions of its Reach Code that require new buildings to be all-electric
(City of Half Moon Bay, Building Electrification, checked 22 November 2026).
Demolition here also falls under the regional stormwater permit, the source of PCB screening for older buildings: covering municipal stormwater discharges from entities in Alameda, Contra Costa, San Mateo, Santa Clara, and Solano counties listed in the Order
(San Francisco Bay Regional Water Quality Control Board, Stormwater, checked 22 November 2026) The City pages read for this guide did not include a PCB form of its own; the PCB screening page explains what the screening covers.
Rental complaints: City or county
Which office takes a housing complaint in Half Moon Bay depends on the size of the building. County Environmental Health handles apartment buildings of four units or more, and its list of conditions includes leaking roofs, faulty plumbing and mold (San Mateo County Health, Renters Resources, checked 22 November 2026). Houses, duplexes and triplexes go to the City.
The City describes its own approach in one line: The City of Half Moon Bay operates as a complaint-based Code Enforcement system.
(City of Half Moon Bay, Code Enforcement, checked 22 November 2026) Complaints go in through an online portal (City of Half Moon Bay, Code Enforcement, checked 22 November 2026).
Half Moon Bay also has a Tenant Protections Ordinance, Municipal Code Chapter 6.08, with eviction, relocation and anti-harassment rules (City of Half Moon Bay, Tenant Protections, checked 22 November 2026). A demolition or substantial remodel counts as a no-fault reason to end a tenancy (City of Half Moon Bay, Tenant Protections, checked 22 November 2026), and in those remodel cases tenants may have the right to reoccupy the unit after construction is completed
(City of Half Moon Bay, Tenant Protections, checked 22 November 2026).
Separately, the City registers rentals every year: The Residential Rental Registration will require each rental unit in the City limits to be registered annually.
(City of Half Moon Bay, Residential Registry Program, Frequently Asked Questions, checked 22 November 2026)
Landlord planning a remodel, or tenant about to file? Call and ask what an inspection would record.
Call 510-288-9993Asbestos and lead paint rules in Half Moon Bay
FoxMeter does not offer asbestos surveys or lead paint inspections at this time. This section explains what local agencies ask for and who is allowed to do the work.
The City pages read for this guide carry no separate rules on these two materials, so the regional and county rules apply. The Air District’s notice rule covers Every demolition regardless of asbestos content.
(Bay Area Air District, Asbestos, checked 22 November 2026) For renovations the trigger is size: Any renovation involving the removal of 100 sq. ft. or more, 100 linear ft. or more, or 35 cubic feet or more of asbestos.
(Bay Area Air District, Asbestos, checked 22 November 2026)
San Mateo County Health sends asbestos concerns about housing to the Air District (San Mateo County Health, Renters Resources, checked 22 November 2026) and runs a Lead Prevention Program, whose page warns: If your home was built before 1978, interior/exterior paint may contain lead.
(San Mateo County Health, Lead Prevention Program, checked 22 November 2026) County programs are listed on the San Mateo County page.
Who may be paid for the surveys is set by state law. No one may work as an asbestos consultant unless he or she is certified by the Division of Occupational Safety and Health
(California Legislative Information, Business and Professions Code section 7180, checked 22 November 2026), and Only those who are paid to do lead inspections are required to be CDPH LRC-certified Inspector/Assessors.
(CDPH, Is Certification Required?, checked 22 November 2026)
What you can order in Half Moon Bay
A mold inspection, with air or surface samples where they help, is the main service; the Half Moon Bay mold page covers rentals and sales.
PCB screening of caulk and other materials is available before a demolition permit application.
A test for lead in drinking water is a separate visit with its own sample bottles.
FoxMeter tests and reports. It does not remove mold or make repairs.
County and other cities
Half Moon Bay is in San Mateo County, and the countywide rules are on the San Mateo County page.