How old Cupertino’s homes are
Census estimates put Cupertino at 22,158 housing units. Roughly 64% went up before 1980 and 17% before 1960 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 (Year Structure Built), Cupertino city, California, checked 22 November 2026), and the median home dates from 1973 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25035 (Median Year Structure Built), Cupertino city, California, checked 22 November 2026).
Single-family houses account for 71% of units, and buildings of five or more units for 22% (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25024 (Units in Structure), Cupertino city, California, checked 22 November 2026). About 39% of occupied homes are rented (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25003 (Tenure), Cupertino city, California, checked 22 November 2026).
A construction decade is a statistic about a neighborhood, not a finding about a wall. Whether a particular Monta Vista ranch house or a Rancho Rinconada bathroom has a moisture problem is answered on site, with readings and, when they add something, samples.
Cupertino’s demolition checklist, step by step
The Building Division’s procedure checklist, revised in January 2026, opens with a broad rule: Demolition permits are required for all sites where a demolition of any building, structure, and/or pool is proposed.
(City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026) Fees are paid when the application goes in, and every item on the list has to be finished before the permit is issued (City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026).
Timing with new construction is spelled out. An application for a Demolition Permit may be submitted concurrently with a Building Permit.
(City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026) The order still matters: A building permit for new structure will not be issued until the demolition permit is issued.
(City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026)
Several letters come from outside the City. The utility confirms that gas and electric service are cut at the main or street (City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026), and the Planning Department confirms whether the structure is a historical landmark (City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026). Another line reads: Provide a letter from a pest control contractor stating that the site has been inspected and is clear of all pest/vermin.
(City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026)
Trees appear on the site plan too, with species, trunk diameter and protection measures for both on-site and street trees (City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026).
Debris is handled through Green Halo. Submit a Construction and Demolition (C&D) Debris Management Plan (DMP) through Green Halo
(City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026) The Environmental Programs Division says all Covered Projects must submit a Debris Recovery Plan at the time of building permit application and plan review.
(City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026) For a house, that means demolition, a new home, or an addition or alteration that adds square footage (City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026).
The diversion target is stated plainly: Covered Projects must recycle or divert from landfill a minimum of 65% of nonhazardous construction and demolition waste.
(City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026) Pressure-treated lumber is kept out of the mixed loads and handled as hazardous material (City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026). At the end of the job, A hold will be placed on the building permit final inspection until the Debris Recovery Plan has been finalized in Green Halo
(City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026)
The PCB step sits on the same checklist: Submit a PCB Screening Assessment Form to determine if the structure being demolished is an applicable structure
(City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026). The Environmental Programs page adds that applicants proposing to demolish a building must submit a PCBs (Polychlorinated biphenyls) Screening Assessment Form prior to obtaining a demolition permit
(City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026), a rule in place since January 24, 2019 (City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026). Interior demolitions are left out (City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026).
What the form decides: The Screening Form will determine if the building is likely to have materials containing PCBs.
(City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026) The page singles out buildings built or remodeled from 1950 to the start of 1981, whose caulks, gaskets, insulation or mastic may hold PCBs at or above 50 ppm (City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026). Approval comes first: You must have this form approved before receiving a building permit for demolition.
(City of Cupertino, Waste and Stormwater Management (Green Development), checked 22 November 2026)
The countywide stormwater program behind this explains its scope, and notes Single-family homes and wood-frame structures are exempt.
(SCVURPPP, Managing PCBs during Demolition, checked 22 November 2026) The regional permit is summarized on the PCB screening page (San Francisco Bay Regional Water Quality Control Board, Stormwater, checked 22 November 2026).
Where Cupertino renters take a housing problem
Cupertino routes resident reports through Cupertino 311. Submit a service request online or through the mobile app, which also provides City information on the go.
(City of Cupertino, Report an Issue: Cupertino 311, checked 22 November 2026) Its Housing Concerns category includes a Living Conditions subcategory, next to Eviction/Dispute (City of Cupertino, Report an Issue: Cupertino 311, checked 22 November 2026).
Once a report reaches Code Enforcement, the City describes the first step simply: A complaint is received and a case is opened.
(City of Cupertino, Code Enforcement Process, checked 22 November 2026) Officers then investigate, and the possible outcomes range from a written warning to an order to vacate an unsafe building (City of Cupertino, Code Enforcement Process, checked 22 November 2026).
Santa Clara County’s Department of Environmental Health points tenants to the same place: Need to submit a substandard housing complaint? Contact your local city code enforcement!
(County of Santa Clara, City code enforcement contacts, checked 22 November 2026)
For disputes rather than repairs, the Housing Division’s Renter Support page directs tenants and landlords to Project Sentinel (City of Cupertino, Renter Support, checked 22 November 2026), which offers rental support services such as free, neutral, and confidential dispute resolution
(City of Cupertino, Renter Support, checked 22 November 2026). The page also summarizes the state Tenant Protection Act and notes Most multifamily rental properties that are at least 15 years old are subject to this law.
(City of Cupertino, Renter Support, checked 22 November 2026)
Local tenant rules are under review: the Housing Commission had a draft Just Cause Eviction Protection Ordinance on its September 24, 2026 agenda (City of Cupertino, Housing, checked 22 November 2026).
Steps for a mold complaint in a Cupertino rental are on the page about mold testing in Cupertino.
Landlord answering a 311 case, or tenant about to open one? Call to ask what an inspection would record.
Call 510-288-9993Asbestos and lead paint rules in Cupertino
FoxMeter does not offer asbestos surveys or lead paint inspections at this time. This section explains what local agencies ask for and who is allowed to do the work.
The Cupertino demolition checklist asks for a notification letter from the Bay Area Air Quality Management District carrying an ASB Number (City of Cupertino, Procedure Checklist for Demolition Permits (demolition permit package), checked 22 November 2026). The district’s rule applies to Every demolition regardless of asbestos content.
(Bay Area Air District, Asbestos, checked 22 November 2026)
For older paint, the county has started a program: The Lead Safe Homes Program is a NEW county program administered by Habitat for Humanity
(County of Santa Clara, Learn about the Lead Safe Homes Program, checked 22 November 2026). Other county programs are collected on the Santa Clara County page.
Paid lead inspections are limited by state law to certified people. The Department of Public Health states: Only those who are paid to do lead inspections are required to be CDPH LRC-certified Inspector/Assessors.
(CDPH, Is Certification Required?, checked 22 November 2026)
Services for a Cupertino address
A mold inspection ends with a written report: what was observed, where moisture was measured, what was sampled and what the laboratory found.
For a building that falls in the City’s 1950 to 1981 window, PCB screening can be arranged before the Screening Assessment Form goes to the Environmental Programs Division.
Cupertino homes are served by three water systems, the City-owned one among them (City of Cupertino, Water, checked 22 November 2026); testing for lead in drinking water at the tap is ordered through the drinking water testing page.
FoxMeter tests and reports; it does not remove mold or do repairs.
Santa Clara County and other cities
Cupertino is in Santa Clara County. Countywide programs are on the Santa Clara County page.
Nearby on our list: Sunnyvale, Santa Clara, San Jose, Saratoga, Los Altos and Los Altos Hills. Their demolition paperwork differs from Cupertino’s, so check each city’s own list.