How old Berkeley’s housing is
The American Community Survey puts Berkeley at 53,145 housing units. Roughly 81% of them went up before 1980, and 61% before 1960 (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 (Year Structure Built), Berkeley city, California, checked 22 November 2026). Half the stock is older than 1944, the median year built (U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25035 (Median Year Structure Built), Berkeley city, California, checked 22 November 2026).
Those numbers describe the city as a whole. They say nothing about the crawlspace or bathroom of one particular house.
For a single address the questions are practical ones: where water has gotten in, whether it was dried, and what a sample shows today.
Permits, Form #103 and the waste plan
Berkeley’s Building and Safety pages are direct about scope: All construction work and most repairs require building permits unless specifically exempted.
(City of Berkeley, Building Permits, checked 22 November 2026) Alterations to an existing structure and demolition both need one, and the application goes through Permits Online or an appointment at the Permit Service Center (City of Berkeley, Building Permits, checked 22 November 2026). A project valued at $60,000 or more also triggers a Private Sewer Lateral Certificate (City of Berkeley, Building Permits, checked 22 November 2026).
A full teardown uses Form #103, which the City reserves for structures being completely demolished (City of Berkeley, Form #103 Demolition Permit Application, checked 22 November 2026). Its list starts with a site plan and photographs of every side of the building (City of Berkeley, Form #103 Demolition Permit Application, checked 22 November 2026).
Two items hold up issuance. One is the debris plan: Construction Waste Management Plan form with Green Halo tracking # required prior to issuance
(City of Berkeley, Form #103 Demolition Permit Application, checked 22 November 2026). The other is a job number from the Bay Area Air Quality Management District, covered in the reference section below.
Sewer capping, work in the right of way and street staging with debris boxes go on a separate Public Works permit (City of Berkeley, Form #103 Demolition Permit Application, checked 22 November 2026).
The City also asks for PCBs screening with demolitions. Its own form says: Complete all applicable parts of the PCBs Screening Assessment Form and submit with your demolition permit application.
(City of Berkeley, PCBs Screening Assessment Form, checked 22 November 2026) A wood-framed or single-family building finishes the screening after Part 2; other buildings are asked whether they were built or remodeled between 1950 and 1980 (City of Berkeley, PCBs Screening Assessment Form, checked 22 November 2026). The form ties the program to the regional stormwater permit (City of Berkeley, PCBs Screening Assessment Form, checked 22 November 2026), which covering municipal stormwater discharges from entities in Alameda, Contra Costa, San Mateo, Santa Clara, and Solano counties listed in the Order
(San Francisco Bay Regional Water Quality Control Board, Stormwater, checked 22 November 2026). What the screening involves is on the PCB screening page.
Rental complaints go to Housing Code Inspections
The City’s starting point is the landlord. If the issues are not fixed, tenants can request an inspection by the City.
(City of Berkeley, Tenant Request for Housing Inspection, checked 22 November 2026) Requests go in through the Citizen Serve portal or on a paper Request for Service form (City of Berkeley, Tenant Request for Housing Inspection, checked 22 November 2026).
Inspectors put complaint units first: the City will prioritize inspecting units where tenants have submitted a complaint to Housing Code Inspections
(City of Berkeley, Housing Code Inspections, checked 22 November 2026). The first visit carries no fee, and where violations are found the City will provide a written report of the issue and set a timeline for correction
(City of Berkeley, Housing Code Inspections, checked 22 November 2026) (City of Berkeley, Housing Code Inspections, checked 22 November 2026).
Owners have their own duty under the Rental Housing Safety Program. Owners of rental properties are required to inspect their units by July 1 each year.
(City of Berkeley, Rental Housing Safety Program (RHSP), checked 22 November 2026) The City also picks rental properties at random for a full inspection, and an owner who cannot show the latest checklist may be cited (City of Berkeley, Rental Housing Safety Program (RHSP), checked 22 November 2026).
How these offices treat mold specifically is on the Berkeley mold testing page.
Owner checking units before July 1, or tenant waiting on a repair? Call and ask what an inspection would document.
Call 510-288-9993Asbestos and lead paint rules in Berkeley
FoxMeter does not offer asbestos surveys or lead paint inspections at this time. This section explains what local agencies ask for and who is allowed to do the work.
Berkeley’s Form #103 lists one air district item among its submittals: BAAQMD Job # required prior to issuance
(City of Berkeley, Form #103 Demolition Permit Application, checked 22 November 2026). The district’s notification rule covers Every demolition regardless of asbestos content.
(Bay Area Air District, Asbestos, checked 22 November 2026) Smaller jobs fall under it too: Any renovation involving the removal of 100 sq. ft. or more, 100 linear ft. or more, or 35 cubic feet or more of asbestos.
(Bay Area Air District, Asbestos, checked 22 November 2026)
On lead paint, the City’s permit forms page carries an Unsafe Lead Work Practices flow chart for complaints and a form asking the City to investigate unsafe work practices (City of Berkeley, Permit Forms, checked 22 November 2026). Alameda County’s healthy homes program offers free in-home consultations here: they are Available for residential properties built before 1978 in Alameda, Berkeley, Emeryville, and Oakland.
(Alameda County Healthy Homes Department, Housing Services, checked 22 November 2026) County programs are summarized on the Alameda County page.
Who may be paid for this survey work is a state matter. The Department of Public Health puts it this way: Only those who are paid to do lead inspections are required to be CDPH LRC-certified Inspector/Assessors.
(CDPH, Is Certification Required?, checked 22 November 2026)
What you can order for a Berkeley address
A mold inspection with air or surface samples where they answer a real question, followed by a plain reading of the laboratory report.
A test for lead in drinking water, described on the drinking water testing page.
PCB screening to go with the City’s form before a Form #103 demolition.
FoxMeter tests and reports. It does not remove mold or carry out repairs.
Alameda County and nearby cities
Berkeley belongs to Alameda County; county programs are on the Alameda County page.
Nearby on our list: Albany, Emeryville and Oakland.